For an inactive version, evidence of another project, contract or baseline, evidence from the future or older than the last check or failure, a total or interval that regressed, a duplicate request, or a reconciled request that is missing or changed.
Replace a checked interval only for the active full record; never erase local liabilities. A finished local request that the evidence lists is reconciled once: its supplier cost counts through the reported total and its local gross leaves the unreported deduction.